Home
SandingPolishingWipingMaskingTools
Industries About Gekatex Document request Contact
ZHENFRDEITES
Home/Industries
Industries

Surface processes across press, body shop, paint shop and assembly

Gekatex products sit at four critical stages of vehicle manufacturing. Each item is specified against the actual conditions of the station, including temperature, pressure, takt and substrate.

01

Press and body shop

Weld seams, brazed joints and press panel surfaces form the base for painting. This stage requires high material removal with controlled thinning of the parent metal.

  • Laser brazed seams levelled and finished in one operation
  • Spatter and slag removed without marking the panel
  • Defect detection mesh replaces the oilstone
02

Paint preparation

Nibs, runs and sanding scratches on e-coat and primer must be removed before topcoat. Dry sanding requires dust control, wet sanding requires clear defect detection.

  • Film backing maintains consistent scratch depth
  • Net discs on extraction keep station dust controlled
  • P1500 to P4000 staged refinement leaves polishing margin
03

Topcoat and masking

The two-tone boundary is a primary appearance audit area. Tape must hold a compound curve and release after bake without residue or edge step.

  • PVC fine line tape holds 160 °C for 30 minutes
  • Overlaps onto its own backing for long boundaries
  • Masking film controls haze while keeping the panel readable
04

Polishing and inspection

Haze, holograms, orange peel and sanding scratches each require a different combination. Pad density and compound grading must match to avoid secondary defects.

  • One step compounds with wool pads reduce operations
  • Open cell foam dissipates heat and prevents paint burn
  • Dedicated combinations for dark colours and 2K clear coats
Customers

Supplied to production lines of major OEMs and tier one suppliers

Plastic Omnium

Submit a process requirement for engineering review

Sample requests, spray trial support, product selection and volume pricing. Use the form below. Response within two working days.